Cambios

2.6 KM Link Test Downtown Bogota - Guadalupe Hill

1591 bytes añadidos, 02:48 16 jul 2017
sin resumen de edición
About the second test node, the chosen point was Torres Blancas complex, thanks to a tenant who allowed Network Bogotá to install temporarily the required equipment.
 
[[File:Torres Blancas.JPG|thumb|150px|Torres Blancas complex]]
[[File:Cerro de Guadalupe.JPG|thumb|150px|Guadalupe Hills]]
 
== Planning ==
 
Planning this test required lots of work on several fields. From space management, working permissions, staff transport, router tweaks and autonomous electrical power system for the Guadalupe node can be counted among all the time invested.
 
Preparing antenna's poles, the design and construction of the electrical autonomous system and software configuration, 15 days were required to fulfill these tasks, with shifts beginning at 9:00 and finishing at 20:00.
 
 
 
Tuvo lugar un intento de enlace entre el cerro de Monserrate y un parquedero ubicado en el sector de La Rebeca que se vio frustrado ya que los funcionarios del Teleférico de Monserrate impidieron el ascenso de los equipos a la cima de la montaña, y a su vez el administrador del parqueadero en La Rebeca cambió de opinión y negó la instalación del segundo nodo allí. Considerando los obstáculos descritos y la conjunción de nuevas posibilidades (transporte en vehículo) se optó por el cerro de Guadalupe y el edificio Torres Blancas como lugares para realizar el laboratorio.
 
Luego de una reunión de planificación que incluyó ascenso de todo el equipo de Network Bogotá a Guadalupe el día 4 de Junio de 2017 se decidió realizar el enlace 3 días después, fecha que permitió que se sumaran varios integrantes a la labor.
[[File:Visitaguadalupe.jpg|thumb|200px|Visita Guadalupe]]
 
[[File:Gif guadalupe.gif|center|350px|thumb|Proyección de las distancias del enlace]]
468
ediciones